Know exactly what goes into every product.

Give every finished product a clear material recipe. Set quantities and waste allowances once, then calculate requirements for the quantity you want to make.

Fabriqo productRecipes & Bills of Materials (BOMs)

The production view of a Cedar & Smoke recipe: per-product quantities with allowance, run requirements and recorded consumption. Expand to see the full record.

Make your material requirements clear.

Define the materials, quantities, and waste allowances for every product.

Build a clear material list

Add the raw materials and packaging used in each product. Record the quantity per finished unit using each material’s inventory unit.

Allow for routine material waste

Add a waste allowance to individual recipe lines, such as wax lost during pouring. Fabriqo includes that allowance in material requirements.

Scale requirements to the batch

Check what you need for 10, 50, or 100 units. The same recipe quantities support material availability checks and recorded production consumption.

Turn one candle’s recipe into a 50-unit batch.

Each candle uses 0.2 kg of wax, one jar, and one wick. You allow 2% extra wax for normal pouring waste.

  1. Set the per-unit quantities

    Add 0.2 kg of wax, 1 jar, and 1 wick to the product’s recipe.

  2. Include the wax allowance

    A 2% allowance makes the wax requirement 0.204 kg per candle: 0.2 × 1.02.

  3. Check a batch of 50

    Fabriqo calculates 10.2 kg of wax, 50 jars, and 50 wicks before you record any additional scrap.

The batch quantity changes. The material calculations stay consistent.

Recipes use the current material list. Updating a recipe changes future production receipts; earlier recorded consumption stays in history.

Give every product a dependable recipe.

Start with one finished product and the materials you use to make it.

Request early access